Townsville Connection Road Stage 2 and 4

The Townsville Connection Road Stage 2 and 4 project involved the upgrade of a key arterial road to enhance safety and capacity. Spanning from University Road to Bowen Road Bridge, this $96 million upgrade included widening the road to four lanes and improving three major intersections: Gartrell Drive, Mervyn Crossman Drive/Fairfield Waters Drive, and Kokoda Street. Additionally, the project focused on enhancing pedestrian and cyclist safety with wider paths and safer crossings.

Hansen Engineering Group provided comprehensive support through design, construction phase support, and condition assessments. This included civil and structural engineering, drainage and pavement design, culvert design, and certification services. Our team played a critical role throughout the two-year construction program, including supporting flood recovery following the 2025 event.

LOCATION: Townsville, QLD
CLIENT: Albem Operations
KEY CHALLENGES & OUTCOMES
  • Designing and certifying key infrastructure upgrades for high-traffic roads.
  • Collaborating with TMR and Albem to deliver construction phase support and temporary works.
  • Implementing effective drainage and pavement solutions to manage 24,000 vehicles daily.

KEY SERVICES
  • Civil Engineering Design
  • Structural Engineering
  • Construction Support

This project highlights our expertise in roads and highways and bridge engineering, delivering safety improvements and infrastructure upgrades for Department of Transport and Main Roads (TMR) projects.