Tully River Main Bridge

Hansen Engineering Group was engaged to perform independent verification for the Tully River Main Bridge, a steel girder rail bridge spanning 116 meters across the Tully River. The bridge comprises seven spans, with cast-in-place piles, reinforced concrete headstocks, and abutments. Our role focused on ensuring the design and construction met the required engineering standards, safety protocols, and operational requirements for the rail network.

The independent verification process covered structural integrity, design compliance, and quality control, providing confidence in the bridge’s long-term reliability and performance.

LOCATION: Tully, QLD
CLIENT: Tully Sugar Limited
KEY CHALLENGES & OUTCOMES
  • Verification of a complex steel girder rail bridge with multi-span design
  • Assessment of reinforced concrete and cast-in-place pile foundation systems
  • Assurance of structural compliance with engineering standards

KEY SERVICES
  • Independent Verification
  • Structural Engineering

This project showcases our expertise in bridge engineering and rail infrastructure, providing independent verification services to ensure the structural integrity and safety of key transport infrastructure.

View More Projects